Fishers road construction updates, week of Jan. 1

131st Street

There will be periodic lane restrictions at the intersection of 131st Street and Cumberland Road while utility relocation work is completed.

106th Street

Crews will be landscaping the center of the roundabout at 106th Street and Geist Road throughout the week, weather permitting. Temporary lane restrictions may be in place as work is completed.

Interstate 69

Milestone Contractors has opened additional travel lanes on Interstate 69 between State Road 37 Exit 205 and State Road 38 Exit 219. I-69 is open to three lanes in each direction on the heavily traveled stretch of interstate.

As part of a $92 million design-build contract, Milestone has added a third lane in each direction to the median, repaired and resurfaced existing pavement, and rehabilitated bridges and drainage structures on 15 miles of I-69 in Hamilton and Madison counties. Construction of an additional auxiliary lane between the 116th Street entrance ramp to I-69 South and the I-69 South Exit 204 ramp to 106th Street will continue through next spring.

I-69 South will be temporarily reduced to two lanes to allow space for the State Road 37 and 116th Street entrance ramps to safely merge while construction continues on the southbound auxiliary lane between the 116th Street and 106th Street ramps.

Crews closed lanes on I-69 South and State Road 37 South on Dec. 8 to modify pavement markings in the area to establish this winter traffic pattern. Questions about this project should be directed to INDOT at eastcentralin@indot.in.gov or 1-855-463-6848.

State Road 37

The Meeting Presentation from the Dec. 11 State Road 37 Project Public Meeting, along with additional information about the project, is available here.

The State Road 37 improvement project is a $124 million joint project between Fishers, Hamilton County, Noblesville and INDOT. Questions or concerns may be directed to drivefishers@fishers.in.us.

Outside of Fishers

Cyntheanne Road between 146th 156th streets will be closed through the end of December to replace the bridge over Keiser Drain. Please contact Hamilton County Highway Department at 317-773-7770 with any questions.