Allisonville Road set to reopen Sunday evening

As of June 9, no left turns will be allowed at the 146th/Allisonville intersection. (Graphic provided by Hamilton County Highway Department)

At 6 p.m. on Sunday, June 9, Allisonville Road at 146th Street will be opened to traffic.

The intersection will use a temporary signal during this next phase. Please use caution and be aware of the signal when traveling through the intersection. No left turns will be permitted at the intersection.

The temporary signal at Greenfield Avenue and Herriman Boulevard will be removed after Allisonville Road is reopened to traffic.

Use extreme caution while driving through this construction zone. Workers have continued to notice a lot of traffic going above the posted speed limit of 35 mph. Due to the prevalence of speeding through the construction zone, the Fishers Police Department, Noblesville Police Department, and the Hamilton County Sheriff’s Department have increased patrols along 146th Street. Please be cognizant of the speed limit. It is posted at 35 mph for the safety of construction crews, as well as local residents exiting their subdivisions through this heavily traveled corridor.

Be the first to comment on "Allisonville Road set to reopen Sunday evening"

Leave a comment

Your email address will not be published.


*