Fishers road construction updates, week of Aug. 15

State Road 37 & 146th Street

All left-turn lanes are currently restricted on SR 37 and on 146th Street with traffic moved to the interior lanes. Thru traffic and right turns on SR 37 and 146th Street will remain open. Drivers are encouraged to seek alternate routes for all left-turn access. View an alternate route map here.

On Monday, Aug. 15 and Tuesday, Aug. 16 between 9 a.m. and 3 p.m., there will be single-lane restrictions in place for westbound and eastbound 146th Street to pour the curb and gutter.

From Monday, Aug. 15 through Friday, Aug. 19, there will be single-lane restrictions for northbound and southbound SR 37 and eastbound and westbound 146th Street for milling and resurfacing of the ramps and 146th Street.

State Road 37 & 131st/135th Streets

135th Street west of SR 37 is currently closed as work progresses on the project. SR 37 will remain open both northbound and southbound and allow right in/right out access at 131st Street. View the detour map here.

Please drive with caution through these areas. To learn more about the State Road 37 Improvement Project and sign up to receive text updates, visit 37Thrives.com.

Technology Drive (Northeast Commerce Park)

The inside lane of Technology Drive is currently closed to traffic to allow for construction of new pavement in the inside lane. One-way traffic will be in place in the outside lane as shown here. Access to all businesses will be maintained during the construction.

Commercial Drive

On Monday, Aug. 15 between 10 p.m. and 6 a.m., there will be single-lane restrictions on northbound and southbound Commercial Drive from 116th Street to Technology Way while repairs are made to business aprons.

Fishers Corner Boulevard

On Tuesday, Aug. 16 and Wednesday, Aug. 17 between 10 p.m. and 6 a.m., Fishers Corner Boulevard will be closed for asphalt patching from Commercial Drive to the McDonald’s entrance/exit.

Fall Creek Road

On Sunday, Aug. 14 between 10 p.m. and 6 a.m., eastbound Fall Creek Road will be closed from Brooks School Road to Bridgewater Road for strip patching. Barricades will be in place to prevent eastbound traffic.

116th Street

On Tuesday, Aug. 16 between 9 a.m. and 4 p.m., there will be single-lane restrictions in place for westbound 116th Street at Hague Road for installation of a wood guardrail.

On Thursday, Aug. 18 and Friday, Aug. 19, the right turn lane in front of the First Internet Bank will be restricted between 9 a.m. and 3 p.m. for the replacement of concrete sidewalk panels.

Comcast will have daily lane restrictions in place on westbound 116th Street between Cameron Drive and Allisonville Road and northbound Allisonville Road between 116th Street to the Kroger signal for overhead work. Restrictions will be in place between 9 a.m. and 3 p.m.

Resurfacing projects

ADA ramp and curb reconstruction has started taking place in Brookston Place and Valleys at Geist as part of the 2022 Resurfacing Project. Homeowners will be notified via door hangers prior to any curb reconstruction near their home. After ADA ramp and curb reconstruction is completed, those areas will be restored with topsoil and seed. It is the responsibility of the homeowner to water the seed for the seed to germinate. Prior to road resurfacing, residents will be notified via street signage for street parking restrictions.

Development Dashboard

The Fishers Planning & Zoning Department has a new Development Dashboard where you can view all development projects that are under construction or in the process of being reviewed. Find it on the Planning & Zoning homepage here.