Details of 90-day closure along Allisonville Road

Graphic provided by Hamilton County Highway Department

Here are the latest updates for the upcoming 90-day closure of Allisonville Road.

Remember, eastbound and westbound 146th Street will not be closed nor will the intersection. Lane restrictions will be in place, which will still be needed from time to time along 146th Street.

Allisonville Road between 146th Street and Kensington Drive (north of 146th Street), and between 146th Street and Helmsley Court (south of 146th Street) are the closure limits.

The posted detour route will be 131st Street, State Road 37, and Greenfield Avenue.

Thursday, Feb. 29 into Friday, March 1

The contractor will complete work in preparation of the upcoming Allisonville Road closure throughout the project limits and along the detour route. At or after midnight, barricades will be put in place along Allisonville Road to close the road for 90 days.

Be prepared for lane restrictions or short-duration lane closures along 146th Street after the closure of Allisonville Road is in place, so that the removal of the overhead signal equipment and other work associated with the traffic switch may be completed.

Friday, March 1 into Saturday, March 2

Between the hours of 9 p.m. and 6 a.m., 146th Street traffic should be prepared for lane restrictions or short-duration closures to complete any remaining signal equipment removal and other work associated with this traffic switch.

Use extreme caution and reduced speeds while driving through this construction zone.