Noblesville will begin its annual street rehabilitation project next week to address the most necessary infrastructure needs within the city. The city has budgeted $2.6 million to address road and alley repaving and repair work to sidewalks and ramps.
“This year’s list contains projects in every quadrant of the city that will positively impact resident’s neighborhoods and traveling motorists,” Mayor John Ditslear said.
City Engineer John Beery said that this year’s rehabilitation projects include 10 miles of streets and 1.6 miles of alleys in Old Town Noblesville.
“Over the past year, we have completely inventoried and viewed all streets and alleys. Once each road is evaluated and graded, a street rehabilitation list is made based on priority,” he said. “We make every effort to address the worst ones or areas.”
Construction will start with sidewalk and ramp concrete work in Mill Grove before the asphalt work will begin. Additional resurfacing projects include the Meadows, Wellington Northeast, North Harbour, Stony Creek Village, Windwood at Morse, Old Town alleys and miscellaneous thoroughfares.
Earlier this year, the city was able to resurface Greenfield Avenue from State Road 37 to Boden Road and 171st Street between Cherry Tree and Willowview roads using state grants and cost savings from last year’s street rehabilitation program.
Signs will be placed onsite a week before construction begins and mailings will be sent to affected homeowners. This construction will cause minor inconveniences including traffic delays, temporary loss of street parking, construction noise and access restrictions. All measures will be taken to facilitate construction in a quick and timely fashion.
Project status and updates will be reported via the city’s social media feeds. For more information, contact the Engineering Department at 317-776-6330.
Street Rehabilitation Projects
Miscellaneous Thoroughfares – 166th Street (Union Chapel Road to Summer Road); Summer Road (Greenfield Avenue to 156th Street and 156th Street to 166th Street); 191st Street (between Gray Road and Little Chicago Road – this includes storm sewer work); Logan Street (John Street to State Road 38); John Street (State Road 32 to Logan Street); Midland (Hazel Dell Road to Catlin Lane); Bladen Drive (Myland Roundabout at Twin Oaks); and Pennan Court (Cherry Tree Road to MacDuff Drive).
Meadows – Golden Meadow Way (191st Street to Amber Way); Trillium Court; Hyacinth Court; Cornelian Court; Mayapple Court; Harbinger Court; Timothy Lane; Bur Oak Court; Firelight Court; Corn Poppy; Chicory Court; Magenta Drive (Meadows Boulevard to Amber Way); Grasshopper Court; Sandpiper Court; Kestral Court; Blue Flax Court, and Sparrow Court.
Mill Grove – Mill Oak Drive (Maple Grove Way to Mill Grove Drive and Maple Grove Way to Pilot Mill Drive); Edwards Grove Drive; Rioux Grove Court; Bladed Mills Drive; Pilot Mills Drive; Crosscut Lane; and Planer Drive (Little Chicago Road to Maple Grove Way).
North Harbour – Essex Court; Devonshire Court; Surrey Hill; Sedwick Court; Shannon Court; Whitley Court; and Westchester Drive (North Harbour Drive to Cheshire Circle).
Stony Creek Village – Lowell Drive and Aulton Drive.
Wellington Northeast – Chesterfield Drive (Wellington Parkway to Herriman Boulevard); Yorkshire Circle; Glasgow Court; Scarborough Way; Chesterfield Court; Glasgow Lane (Yorkshire Circle to Herriman Boulevard); and Shadowcrest Court.
Windwood at Morse – Hague Road (passing blister at Windwood Parkway).