Latest Fishers road construction updates

State Road 37 & 141st Street

Preliminary construction work is underway at SR 37 and 141st Street. During this time pavement markings and concrete barriers will be placed. There will be no closures during this phase, only intermittent lane restrictions during the hours of 9 a.m. to 3 p.m.

Find construction updates at 37thrives.com.

96th Street & Allisonville Road

Phase 3A of the project will begin in early July, during which there will be a slight shift in traffic to allow the contractor to build the future driveway for the Circle K gas station. This gas station will still be accessible from 96th Street and Allisonville Road.

On or after July 15, the contractor will move into Phase 3B and traffic will shift from the east side of Allisonville Road to the west side and will continue to flow north and south. At this time, the driveway for Circle K constructed in Phase 3A will be accessible. Click here to see a map.

Road resurfacing projects

The contractor is continuing work in the Fox Run and Hillsborough neighborhoods and will work on road resurfacing at the following locations the week of July 8:

  • Walnut Creek on Fortune Drive between Andrews Place and Cumberland Road
  • 106th Street and Cumberland Road roundabout

The week of July 8, the contractor will also work on pavement markings on 126th Street between Olio Road and Thorpe Creek Parkway.

Residents should refrain from parking their vehicles on the street during active construction operations.

Homeowners will be notified via door hangers prior to any curb reconstruction near their home. After ADA ramp and curb reconstruction is completed, those areas will be restored with topsoil and seed. It is the responsibility of the homeowner to water the seed for the seed to germinate. Prior to road resurfacing, residents will be notified via street signage for street parking restrictions.

For additional project information, view the Capital Project Dashboard here.

View the Road Resurface Overview Map here.

Roadways and neighborhoods are prioritized based on the PASER rating condition of their pavement. You can see a map here.

Be the first to comment on "Latest Fishers road construction updates"

Leave a comment

Your email address will not be published.


*