The Noblesville Utility Long Term Control Plan Phase 4 project began excavation the week of July 17 at Evans Avenue and Center Drive where a manhole structure was set over the existing storm sewer. To date, 440 feet of 24-inch reinforced concrete pipe (RCP), 32 feet of 12-inch RCP, three storm structures and two catch basins have been installed. By the middle of next week, the project will be in the middle of the intersection of North and 10th streets. There will be traffic restrictions while working in this intersection. There also will be traffic restrictions as we lay the storm pipe up the south bound lane of 10th Street going north to Roosevelt Drive. The contractor will be putting door hangers on doors and speaking to residents in advance to keep them informed as crews approach their area.