The planned construction for the 146th Street bridge over U.S. 31 has been postponed due to weather. This project is now planned to begin at 9 p.m. on Friday, July 22 and conclude by 6 a.m. on Monday, July 25.
146th Street/U.S. 31 bridge construction postponed
![](https://readthereporter.com/wp-content/uploads/2022/07/146th-Street-bridge-closure-777x437.jpg)